Banner Buitink Technology
We solve it with a flexible lightweight solution!
since 1948

Facade cloths Almere train station

Buitink Technology replaced the full color tensioned wall cloth of Almere Center train station (the Netherlands).

The existing cloth had an insufficient resistance against the local wind conditions. As a result the cloth was released from the framework, started to rattle and finally ripped apart.

Nearly 1,000 square meters of cloth refers to the station's upcoming renovation. Almere Center will soon become the greenest station in the Netherlands.

Cloth tension

Doekspanning

Aluminum profiles

Besides replacing the wall cloth including a new tensioning system, Buitink Technology strengthened the existing support structure/glass framework with Aluminum profiles.

Facade cloths Almere train station

Project data wall cloth

Size: 36 wall cloth,total surface area of about 900 m2
Material: Frontside Print 371of Serge Ferrari
Client: ProRail
Advice: Movares
Wall cloth: Buitink Technology
Year of construction: 2019

Location

Central Station, Almere (the netherlands)

Questions?

Do you have questions or want more information? Please feel free to contact us. Call us at +31 (0)316-250830. But even easier: fill out the contact form below directly. We will contact you as soon as possible!

Contactformulier Engels

How did you find our company? *