Banner Buitink Technology
We solve it with a flexible lightweight solution!
since 1948

Sunshade with blinds for Post South

Buitink Technology has, on behalf of Bouwcombinatie WBC Hegeman, supplied and installed two sun shade systems, equipped with vertical blinds for the new building of Post Zuid in Apeldoorn.

The blinds, made of a gauze fabric, each have a size of 14 x 1 m and are mounted to the building trough a system of stainless steel cables and spacers.

Project data

Material: Ferrari FT 381
Architect: COURAGE architecten/ Mies Architectuur
Client: Gemeente Apeldoorn
Main Contractor: Bouwcomb. WBC Hegeman vof
Blinds System: Buitink Technology
Year of implementation: 2013

Questions?

Do you have questions or want more information? Please feel free to contact us. Call us at +31 (0)316-250830. But even easier: fill out the contact form below directly. We will contact you as soon as possible!

Contactformulier Engels

How did you find our company? *