- Architecture
- Industry
- Leisure
- uk >
- Architecture >
- (ETFE) cushion roofs >
- Renovation ETFE roof Ganzenhoef
Renovation ETFE air cushion roof CEC De Ganzenhoef
On behalf of "VVE Ganzenhoef" Buitink Technology repaired the ETFE air cushion roof of "Cultureel Educatief Centrum De Ganzenhoef". The ETFE roof suffered from storm damage.
Due to a heavy storm the ETFE roof was damaged through falling objects. A complete rooflight dome fell on top of the ETFE cushions. A number of cushions had to be replaced.
Inspection and maintenance ETFE roof
Besides replacing a number of ETFE air cushions we checked the entire ETFE roof. Where needed we exchanged some parts and performed maintenance, amongst others on the air compressor system.
The ETFE cushions were in perfect condition after 14 years of service. The ETFE air cushion roof was delivered and installed already in 2004!
Project data ETFE air cushion roof:
Surface area: | About 950 m² |
Material: | ETFE foil, 300 my, one layer printed. |
Architect: | Hans van Heeswijk Architecten |
Client: | VvE Ganzenhoef |
ETFE cushions en renovation: |
Buitink Technology |
Year of implementation: | 2018 |
Location Ganzenhoef
Bijlmerdreef 1289, Amsterdam
Questions?
Do you have questions or want more information? Please feel free to contact us. Call us at +31 (0)316-250830. But even easier: fill out the contact form below directly. We will contact you as soon as possible!