- Architecture
- Industry
- Leisure
- uk >
- Architecture >
- Lightweight canopies >
- Tensioned Membrane Bergermeer
Load-bearing tensioning membrane for loading ramps
On behalf of TAQA Onshore BV, Buitink Technology produced and installed tensioned membrane and steel cable systems for the loading dock of the gas storage in Bergermeer, The Netherlands.
Material
The membrane is made of the TX30 of Serge Ferrari, having a warranty of 25 years!
Project data
Surface: | Approximately 700 sqm |
Material: | Serge Ferrari TX 30 (type III en V) |
Client: | TAQA Onshore BV |
Design: | Jinx Architecten and Tentech |
Tensioned membrane: | Buitink Technology |
Steel structure: | Oving |
Year of implementation: | 2015 |
Mounting membrane
Watch the movie and discover how the loading dock was installed:
Questions?
Do you have questions or want more information? Please feel free to contact us. Call us at +31 (0)316-250830. But even easier: fill out the contact form below directly. We will contact you as soon as possible!