- Architecture
- Industry
- Leisure
- uk >
- Technology Center >
- Innovation >
- The Ocean Cleanup >
- Role of Buitink Technology
Role of Buitink Technology
Buitink Technology produced the two screens for the North Sea Prototype 2 and 3. Applied techniques are industrial cutting, sewing and high frequency welding.
Collaboration with the Ocean Cleanup foundation
In the preparatory phase Buitink investigated together with the Ocean Cleanup various methods and details to assemble, interconnect and fix the screens to the HDPE tubes. Buitink together with TOC looked into the forces on and deformation of the membrane and the results were taken into account in cutting the shape (giving the lower part of the screen membrane more space).
Buitink Technology in-house tested various proposals and design details on strength and feasibility
Questions?
Do you have questions or want more information? Please feel free to contact us. Call us at +31 (0)316-250830. But even easier: fill out the contact form below directly. We will contact you as soon as possible!